Water Treatment Plants
Roberts Creek Water District
MAP Engineering, Inc. provided Construction Management for the
upgrade of Roberts Creek Water District’s Water Treatment Plant to 4 million
gallons per day with membrane treatment and UV disinfection to meet new EPA
requirements. This included design, oversight
and inspection of the installation of a new plant building, filtration membrane
units, UV units, underground water/sewer/storm, erosion control BMPs, grading
and asphalt, retaining walls, sidewalks, etc.
The construction cost was approximately $6,900,000.
Good post. Children are particularly vulnerable to waterborne diseases. Their small bodies take in a disproportionately large quantity of water and its contaminants, and their immune systems are not equipped to fight off invaders such as E. coli, giardia and the typhoid bacteria. More than 2 million children are killed by such diarrheal diseases each year, and 90 percent of them are kids under five.