Water Treatment Plants


 Water Treatment Plants

 Roberts Creek Water District

MAP Engineering, Inc. provided Construction Management for the upgrade of Roberts Creek Water District’s Water Treatment Plant to 4 million gallons per day with membrane treatment and UV disinfection to meet new EPA requirements.  This included design, oversight and inspection of the installation of a new plant building, filtration membrane units, UV units, underground water/sewer/storm, erosion control BMPs, grading and asphalt, retaining walls, sidewalks, etc.  
The construction cost was approximately $6,900,000.







Project Management

        Umpqua Valley Christian Gym


MAP Engineering, Inc. with Marquess and Assoc.  as subcontractor provided Umpqua Valley Christian with engineering assistance to build a new gym.  This project was both a design-build and a design-to-cost project.  MAP strove to lessen costs wherever feasible throughout the project.  One example of such a cost saving measure was by eliminating the need for a fire pump by separating the fire system.  The City system had adequate flow and pressure to feed the sprinkler system but not enough flow or storage for the fire hydrants. We constructed an onsite storage tank to hold the required amount of fire flow and build a separate system to feed the fire hydrants. This saved UVC the upfront cost of a fire pump and controls and the long term maintenance for the system as well.

Glendale School District

Our firm assisted the Glendale School District with their renovation and improvement project. The entire high school burned down in 1975 and was rebuilt the next year. After almost 30 years of use the school was in serious need of exterior repairs.  Likewise, the interior had very worn flooring. The School District tried several times to pass a bond issue. When they were finally successful they wanted to be sure that the money was put to good use and stretched as far as possible. Our firm was hired to provide design and project management services. The finished project won a national award for innovation, thanks in great part to the contractor, but also due to our approach to cost saving measures.